Every piece of electrical work in the UK should end with a document that records what was done and what was tested. BS 7671 has three model forms, and using the wrong one is one of the most common mistakes in certification. This guide explains which to use and what goes on each.
Electrical Installation Certificate (EIC)
Use an EIC for a new installation, a new circuit, or a major alteration such as a replacement consumer unit. It certifies that the new work has been designed, built, inspected and tested to BS 7671. It has:
- signatures for the design, the construction and the inspection and testing, which can be three different people, or one person on the single-signature version;
- details of the supply and earthing arrangements, the main switch and the bonding;
- a schedule of inspections and a schedule of circuit details and test results;
- any departures from BS 7671, and the recommended date for the first periodic inspection.
Every new circuit must be fully tested: continuity, insulation resistance, polarity, earth fault loop impedance, RCD operation and so on. See the BS 7671 test values for what the results should be.
Minor Electrical Installation Works Certificate (MEIWC)
Use a Minor Works certificate for an addition or alteration to an existing circuit that doesn't include a new circuit: adding a socket to a ring, moving a light, fitting an extra spur. It's a single page, but the circuit still has to be tested, and the form records the results for the circuit that was worked on. Use a separate one for each circuit you alter. If the job involves any new circuit, or a new consumer unit, it's an EIC instead.
Many electricians issue a Minor Works even for a like-for-like swap, such as replacing a damaged socket, because it records the test results and shows the circuit was checked.
Electrical Installation Condition Report (EICR)
An EICR records the condition of an existing installation. It's a report, not a certificate: it doesn't certify any work, it says whether the installation is safe to keep using. Each problem found is given a code (C1, C2, C3 or FI), and the report is satisfactory or unsatisfactory overall. It also records the extent and limitations agreed with the client, for example that only a sample of circuits were tested, and the date of the next inspection.
Never use an EICR to sign off new work. If an electrician fixes items found on an EICR, the repair gets its own Minor Works or EIC.
How often should an installation be inspected?
The person carrying out the inspection decides the next date, based on the installation's age, condition and use. IET Guidance Note 3 gives suggested maximum intervals, including:
| Type of installation | Suggested maximum interval |
|---|---|
| Owner-occupied home | 10 years, and on a change of occupancy |
| Rented home | 5 years, and on a change of tenancy |
| Commercial premises | 5 years |
| Industrial premises | 3 years |
| Caravans | 3 years |
| Swimming pools | 1 year |
| Construction site installations | 3 months |
The landlord rules
| Nation | What the law says |
|---|---|
| England | The installation must be inspected and tested at least every 5 years by a qualified person (or sooner if the report says so). Give a copy of the report to existing tenants within 28 days, to new tenants before they move in, and to the council within 7 days if asked. Remedial work or further investigation must be done within 28 days, or sooner if the report says so. Since 2025 to 2026 the same rules also cover social housing landlords, who must also have the appliances they provide checked at least every 5 years (The Electrical Safety Standards in the Private Rented Sector and Social Rented Sector (England) Regulations 2020) |
| Wales | There must be a valid electrical condition report for each period of occupation. It lasts 5 years, or less if the report says so. The contract-holder must be given a copy within 14 days of the occupation date (The Renting Homes (Fitness for Human Habitation) (Wales) Regulations 2022) |
| Scotland | An inspection before the tenancy starts (no more than 5 years earlier), then at intervals of no more than 5 years. It covers the electrical installation and the fixtures, fittings and appliances the landlord provides. The tenant gets a copy, and the landlord keeps the record for 6 years (Housing (Scotland) Act 2006, sections 19A and 19B) |
In Northern Ireland, the Electrical Safety Standards for Private Tenancies Regulations (Northern Ireland) 2024 have applied since 1 April 2025: inspection and testing at least every 5 years, before a new tenancy starts (existing tenancies by 1 December 2025), a copy of the report to tenants within 28 days, and remedial work within 28 days.
Building regulations notification
An EIC or Minor Works is not the same as building regulations approval. In England and Wales, some domestic work is notifiable, such as a new circuit or a consumer unit change. A registered competent person notifies it and you get a separate building regulations compliance certificate. See notifiable electrical work and Part P. In Scotland the rules come from the building standards system instead.
Keep your certificates
Certificates and reports belong to the person who ordered the work. Keep them with the house deeds: the next electrician needs them, solicitors ask for them when a house is sold, and insurers may ask after a fire.
Going deeper
Schedules and the "limitations" box
On an EICR, the limitations section is where the inspector records anything they couldn't or weren't asked to inspect: under floors, inside walls, circuits that couldn't be switched off, a sample percentage of accessories. A report with a long list of limitations tells you much less than one without, so read it, not just the overall result.
Electronic certificates and schemes
Most electricians fill in certificates with software, and scheme providers (such as NICEIC, NAPIT and ELECSA) publish their own versions of the model forms. They must contain at least the information in the BS 7671 models. Domestic versions combine the schedules for typical home installations.
Who can sign
BS 7671 requires the people signing to be competent for the work they're signing for. The design signature takes responsibility for the circuit design, such as cable sizes and protective devices, not just the installation work. For work you didn't design, don't sign the design box.
Sources
The main references behind this guide. Numbers we worked out ourselves, such as the code outputs, come from running the code.
- BS 7671:2018+A4:2026 Part 6 and Appendix 6: model forms for certification and reporting (IET, paid standard)
- IET Guidance Note 3: Inspection and Testing (frequency of inspection table; paid)
- The Electrical Safety Standards in the Private Rented Sector and Social Rented Sector (England) Regulations 2020, regulation 3
- The Renting Homes (Fitness for Human Habitation) (Wales) Regulations 2022, regulations 5 and 6
- Housing (Scotland) Act 2006, section 19A: electrical safety inspections
- Housing (Scotland) Act 2006, section 19B: inspection records kept for 6 years