EICR report writing simulator

Code findings, check test results and write the report. Marked against Best Practice Guide 4 and BS 7671:2018+A4:2026.Codes marked against Best Practice Guide 4 and A4:2026. About this simulator

About this simulator and how it works

Free demo: level 1 (3 jobs). Levels 2 to 4, including the QS check, are in the full version.

Write real Electrical Installation Condition Reports. Walk round a property, code every finding C1, C2, C3, FI or no code, spot the readings that fail on the schedule of test results, record the limitations, then decide the overall assessment and the next inspection date. Every answer is marked with the reason, based on Best Practice Guide 4.

How it works

  • Walk round. Tap a room on the house, then each numbered marker to read what you found. Give every finding a code: C1, C2, C3, FI, or "No code" when it is not a defect at all. Plenty of things in older houses look wrong but are not.
  • Check the test results. The schedule of test results shows your colleague's readings. Tap any reading that fails its limit and code it. Tap nothing if every reading passes.
  • Write the report. Your observations are listed in the two parts of the Amendment 4 form (C1 and C2, then C3 and FI). Tick the limitations that belong on the report, choose the overall assessment and the interval to the next inspection, then sign it.
  • Danger present. When you code a C1 you also say what you do about it before you leave.
  • Levels. Level 1 teaches the codes with hints on. Level 2 adds test results and older installations. Level 3 brings TT earthing, limitations, FI and live dangers. Level 4 is a QS check: a colleague's finished report with mistakes in it to find and correct.

Each job gives up to three stars. One star means the report is safe: no C1 or C2 missed or under-coded and the right overall assessment. Two stars means every code, reading and C1 action is right. Three stars means nothing wrong at all, with hints off.

The rules it marks against

  • Codes: Electrical Safety First Best Practice Guide 4, Electrical installation condition reporting: classification codes for domestic and similar electrical installations (Issue 7.4, August 2026), which the industry treats as the reference for coding. Where BPG4 gives more than one acceptable code, or inspectors commonly differ (for example reversed polarity at a socket-outlet, C2 or C1), both are accepted.
  • Outcome: BS 7671:2018+A4:2026. Any C1 or C2 makes the installation unsatisfactory. Since Amendment 4, C3 and FI observations go in the second part of the observations and do not make it unsatisfactory on their own.
  • FI: only for a problem you suspect but could not identify within the agreed extent and limitations. Something you measured or saw (an insulation resistance below 1 MΩ, an earth fault at a socket) gets a proper code, as the IET and Electrical Safety First advise.
  • C1: the inspector should try to remove the danger before leaving, with the agreement of the person who ordered the report (for example by isolating the circuit or fitting a blank), and give them written notice straight away. The C1 stays on the report.
  • Test limits: maximum measured Zs from the IET On-Site Guide Table B6 (0.8 × U0 × Cmin ÷ Ia, rounded up to two decimal places as the guide prints it); insulation resistance at least 1 MΩ at 500 V (Table 64); general RCDs within 300 ms at their rated residual current; ring end-to-end readings continuous, r1 and rn within 0.05 Ω. For TT, RA × IΔn must not exceed 50 V (Regulation 411.5.3).
  • Next inspection: rented homes in England at least every 5 years (Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020). Owner-occupied homes up to 10 years (IET Guidance Note 3); the simulator accepts 5 or 10 years there because the interval is the inspector's judgement.

What it simplifies

The properties are domestic and single-phase. You don't fill in every box of the form: the supply characteristics, the full schedule of inspections and the declaration are left out so the game can focus on the decisions that trip people up (coding, the readings, the limitations and the outcome). Coding is always the inspector's own judgement on site, and your company's procedures and your own copies of BS 7671, Guidance Note 3 and Best Practice Guide 4 come first. This is a training game, not a substitute for them.