The rules in each part of the UK
England
All electrical work in a home has to meet Part P of the Building Regulations, which means being designed and installed safely to BS 7671. But only three kinds of job are notifiable, meaning building control has to be told (regulation 12(6A) of the Building Regulations 2010):
- installing a new circuit;
- replacing a consumer unit;
- any addition or alteration to existing circuits in a special location: the zone around a bath or shower, or a room containing a swimming pool or sauna heater.
Approved Document P (paragraph 2.7) adds that replacements, repairs and maintenance are not notifiable anywhere, even in a special location. Kitchens and gardens aren't special locations in England.
Wales
Wales kept the original, wider rules from 2005. Almost all electrical work in a home is notifiable unless it's on the list in Schedule 4: like-for-like replacements, replacing a damaged cable on one circuit, re-fixing enclosures, adding mechanical protection, bonding, and adding lights, switches, sockets or fused spurs to existing circuits. That last group is only exempt if it isn't in a kitchen or special location and isn't on a "special installation": outdoor lighting or power, electric floor or ceiling heating, a generator, or extra-low voltage lighting that isn't a ready-made CE-marked set.
Scotland
Scotland uses building warrants under the Building (Scotland) Regulations 2004. Schedule 3, type 1 means most work to or in a house, electrical work included, doesn't need a warrant, unless the house has a floor more than 4.5 m up. Flats and maisonettes don't get that exemption, so electrical work in them usually needs a warrant, apart from like-for-like replacements. Work that affects a separating wall, such as recessing sockets into a party wall, needs a warrant in any home. Work that doesn't need a warrant must still meet the building standards. Electricians who are Approved Certifiers of Construction can certify their own work for the warrant.
Northern Ireland
Northern Ireland's building regulations don't cover electrical installations, so there's no notification or warrant for electrical work. It still needs to be safe and done to BS 7671, and using a registered electrician is the best way to get that.
Legal isn't the same as safe
Doing notifiable work yourself is legal if you tell building control before you start and pay their fee, but they'll want it inspected and tested to BS 7671, which needs proper test instruments and the skill to use them. Even non-notifiable jobs can kill if a cable is misidentified or the supply isn't safely isolated. If you rent, don't do electrical work yourself: ask your landlord, who's responsible for the installation.
Using a registered electrician
In England and Wales, an electrician registered with a competent person scheme (such as NICEIC, ELECSA or NAPIT) can self-certify notifiable work and notify building control for you. You should get an Electrical Installation Certificate or Minor Works Certificate for the work, and for notifiable work a building regulations compliance certificate. You can check an electrician is registered on the Electrical Competent Person Register. See which electrical certificate you should get.