How it works
Each job is a house with a TN-C-S, TN-S or TT supply, a consumer unit with a surge protective device (either all RCBOs, or a split board with two 30 mA RCDs), and between three and nine circuits. Every job is a different home: a semi, a terrace, a detached house, a town house, a bungalow or a flat, with one or two ring finals (each with a spur), sometimes a radial socket circuit for a garage, loft room, kitchen worktop or home office, one to three lighting circuits with a two-way light on the landing or stairs, and a cooker, shower or immersion heater where the home has one. Some homes have no gas, or a plastic water pipe with nothing to bond. Choose New (the default) or Older installations in the job bar: an older split-load board has some circuits with no RCD. Defects are hidden in it. Your job is the inspection and testing for an Electrical Installation Condition Report: test it, record the results, and log every defect with the right code.
- Pick a level. Apprentice hides one defect and turns the step-by-step hints on. Improver hides two. Electrician turns the hints off and hides several defects (now and then, none at all). Inspector hides more and makes the calls harder. At every level the defect list includes red herrings, so check before you log.
- Workbench. Choose a location (intake, consumer unit, sockets, lights or fixed appliances). Turn the tester's dial, click the red or black socket on the tester, then click the terminal or socket pin you want. Press TEST. For proving dead, pick up the separate two-pole voltage indicator (VI on the dial) and prove it on its proving unit before and after, as Best Practice Guide 2 and GS38 expect. Switch breakers, lock off, disconnect circuits, fit test links, pull lamps and unplug the kettle by clicking them in the drawing.
- Record as you go. After each reading, tap where it belongs (for example r1, R1 + R2 or Zs) and it goes straight onto the schedule. Log defects from the bench with Log a defect.
- Schedule and results. Check the schedule, add the earthing system and the maximum Zs values, and submit. You get a score, up to three stars, badges, and every value against the model answer with the reason for each code.
The timer and the three safety lights at the top keep you honest. Each unsafe act costs a light. In a real practical assessment any one of them would be a fail.
Things go wrong like they do on site
- Switch on with a test link still across line and neutral or earth, and it goes bang: the breaker for that circuit trips. If no breaker clears it, the supply fuse goes.
- Do a high-current loop test on an RCBO circuit, and it trips.
- With a borrowed neutral, the RCBO trips the moment one particular light comes on, and holds in with it off.
- Defects you'd see on a real inspection are drawn in: scorch marks round a socket with a loose joint, a cracked faceplate, a missing blank in the consumer unit, a missing bonding clamp, metal switch plates.
The readings are calculated, not scripted
Behind each scenario is a resistance network of the whole installation: the supply transformer, the supply cable and earthing, every cable run using the IEC 60228 resistance of its conductors, the bonding, and the soil between earth electrodes and pipes. Every reading is solved from that network for exactly where your leads are and what's linked, switched and connected at that moment. That's why things behave as they do on site:
- Forget to null your leads and every continuity reading is high by the lead resistance.
- Cross-connect the wrong ends of a ring and the step 2 readings rise towards the middle instead of staying level.
- Leave a kettle plugged in and the line to neutral insulation resistance test on the ring reads almost zero: you are measuring through its element.
- Leave the lamps in and the lighting circuit's insulation resistance line to neutral is close to zero. Leave the SPD connected and the 500 V test reads low.
- Measure Ze with the main earthing conductor still connected, and parallel paths through the bonding can lower the reading.
- Use the high-current loop test on an RCBO circuit, and it trips.
- On a TT system, a bonded metal water pipe in the ground gives the fault current an extra path back to earth, so Zs can read a little lower than Ze + (R1 + R2).
Safe isolation is marked
Before your first dead test, you need to switch off, lock off, prove the voltage indicator, test L–N, L–E and N–E where you will work (at the board, or at the socket or point on the circuit you locked off), and prove the indicator again. The tester refuses a dead test on a live conductor, and the results list every unsafe act, such as removing the main earthing conductor with the installation energised. See our safe isolation guide.
Limits and coding
- Maximum Zs values are the IET On-Site Guide Table B6 figures (0.8 × U0 × Cmin ÷ Ia, rounded up to two decimal places). Insulation resistance limits are from BS 7671 Table 64, and RCD trip times (300 ms at IΔn, 40 ms at 5 × IΔn) from the device standards BS EN 61008-1 and 61009-1, as used in Guidance Note 3 and the On-Site Guide.
- Classification codes follow Electrical Safety First's Best Practice Guide 4 (Issue 7.4, 2026) and BS 7671:2018+A4:2026: any C1 or C2 makes the report unsatisfactory, and since Amendment 4 an FI on its own does not. Where the guide has no specific entry, the results explain what's accepted and why.
- Continuity values are accepted within 0.03 Ω or 6 to 8 %, which allows for reading differences but not for leads that weren't nulled.
Things to know
- This is a practice aid. It doesn't replace supervised training, the current edition of BS 7671, Guidance Note 3, or the On-Site Guide, and it isn't a qualification.
- Visual inspection is limited to what's drawn and the job notes. On a real EICR, inspection finds many defects that tests can't.
- Each job has a level and number in the address bar, so you can retry the same house or challenge a mate with it. Your best score per level and your badges are saved in this browser only.
Related: ring final testing, insulation resistance testing, earthing systems and the BS 7671 test values cheat sheet.