Home / Learn / Electrical installations

Ring final circuit testing: the three-step continuity test

A ring final circuit: the line, neutral and protective conductors leave the consumer unit, loop through four sockets and return. Cross-connected, every socket reads (r1 + rn) ÷ 4 line to neutral, and the highest line to earth reading is R1 + R2 = (r1 + r2) ÷ 4
Beginner

The ring final circuit is the standard way to wire sockets in UK homes. The cable leaves the consumer unit, loops round every socket and comes back to the same 30 A or 32 A breaker, so each socket is fed from both directions. It's efficient, but it hides faults: if the ring is broken, every socket still works, fed from one end, and the cable can be overloaded without anyone knowing. The three-step test is how you prove the ring is intact.

This is the method in the IET On-Site Guide and Guidance Note 3. Do it with the circuit safely isolated, and null your test leads first.

Step 1: end-to-end resistance

At the consumer unit, identify the two ends of the ring. Measure the resistance of each loop: line to line (r1), neutral to neutral (rn) and cpc to cpc (r2).

  • r1 and rn should be within 0.05 Ω of each other.
  • In 2.5 mm² twin and earth with a 1.5 mm² cpc, r2 should be about 1.67 × r1, the ratio of the two areas. With a 2.5 mm² cpc, it should equal r1.
  • An open circuit means the ring is broken. Find the break before going further.

As a guide, 2.5 mm² copper is about 7.41 mΩ per metre at 20 °C, so r1 of 0.5 Ω is roughly 67 m of cable.

Step 2: line and neutral cross-connected

Connect the line of one end to the neutral of the other end, and the other way round. Now measure line to neutral at every socket, using a plug-in adaptor.

  • Every socket on the ring should read about the same: (r1 + rn) ÷ 4, which is about half of r1.
  • A socket that reads higher is on a spur, by the resistance of the spur cable.
  • Readings that rise steadily towards the middle of the ring mean you've joined the wrong ends: line and neutral of the same end. Swap them and start again.

Step 3: line and cpc cross-connected

Do the same with line and cpc, then measure line to earth at every socket.

  • With a smaller cpc, the readings rise towards the middle of the ring. The highest reading on the ring is (r1 + r2) ÷ 4.
  • That highest reading is the circuit's R1 + R2. Record it on the schedule of test results and use it for the earth fault loop check: Zs ≈ Ze + (R1 + R2).
  • Getting a sensible reading at every socket also proves polarity: line is connected to the right terminal.
Worked example. r1 = 0.52 Ω, rn = 0.53 Ω and r2 = 0.86 Ω. Step 2 should read about 0.26 Ω at every socket. Step 3 should peak at (0.52 + 0.86) ÷ 4 = 0.35 Ω. With Ze of 0.35 Ω, Zs is about 0.70 Ω, well inside the 1.10 Ω maximum for a type B 32 A breaker in the On-Site Guide. The ring final calculator does these sums for you.

Why the readings are a quarter

Cross-connected, the ring becomes one loop twice as long, joined end to end. Any socket sits halfway round it, so it has two equal paths back to the board, each half the loop. Two equal resistances in parallel give half of one, so the reading is a quarter of the loop total.

Spurs and interconnections

  • BS 7671 Appendix 15 says each unfused spur should feed only one single or twin socket, or one permanently connected item. The number of unfused spurs shouldn't be more than the number of sockets and items connected directly on the ring.
  • A fused spur, through a fused connection unit, can feed any number of sockets, as its fuse protects the spur cable.
  • An interconnection, a cable bridging across the ring, makes the step 2 readings vary from socket to socket instead of staying level. If they vary and there's no spur to explain it, look for one.

Things to know

  • BS 7671 Appendix 15 gives a ring final in 2.5 mm² cable on a 30 A or 32 A device as suitable for a floor area of up to 100 m² in a home.
  • Record r1, rn and r2 on the schedule, as well as R1 + R2.
  • Always check against the current edition of BS 7671 and the On-Site Guide.

Sources

The main references behind this guide. Numbers we worked out ourselves, such as the code outputs, come from running the code.

  • IET On-Site Guide and Guidance Note 3: continuity of ring final circuit conductors (three-step test; paid)
  • IET On-Site Guide, Appendix B Table B6: maximum measured earth fault loop impedance at ambient temperature (paid)
  • BS 7671 Appendix 15: ring and radial final circuit arrangements (IET, paid standard)
  • IEC 60228: Conductors of insulated cables (maximum resistance values, paid standard)