How the ring final test works
A ring final circuit leaves the board, goes round every socket and comes back to the same breaker. The continuity test proves the ring is complete, with no breaks or interconnections, and gives you R1 + R2. It's the method in the IET On-Site Guide and Guidance Note 3, done in three steps with the circuit isolated.
Step 1: end-to-end readings
Measure the resistance between the two ends of each conductor at the board: line (r1), neutral (rn) and circuit protective conductor (r2). The line and neutral readings should be within 0.05 Ω of each other, as they're the same size cable. For 2.5 mm² twin and earth with a 1.5 mm² cpc, r2 should be about 1.67 times r1, the ratio of the two cross-sectional areas.
Step 2: line and neutral cross-connected
Join the line of one end to the neutral of the other, and the other way round. Measure line to neutral at every socket. Each socket on the ring should read about the same, (r1 + rn) ÷ 4. A socket that reads noticeably higher is probably on a spur. A big jump suggests a break, or that you've cross-connected the same end.
Step 3: line and cpc cross-connected
Do the same with line and cpc, and measure line to earth at every socket. With a smaller cpc, the readings rise towards the middle of the ring. The highest reading on the ring itself is (r1 + r2) ÷ 4, and that's the circuit's R1 + R2. Record it, and it also proves polarity at each socket.
Why a quarter?
With the ends cross-connected, any socket on the ring sits on two equal paths back to the board, each half of the combined loop. Two equal resistances in parallel halve again, so you get a quarter. That's also why the reading is the same at every socket for step 2.
Things to know
- Null your test leads first, or the readings will all be high by the lead resistance.
- The ring length the tool shows is a rough guide from r1 and the 20 °C resistance of the cable. Temperature and connections add a little.
- The estimated Zs is compared with the On-Site Guide's maximum measured values. Always confirm with a live loop test, and check against the current edition of BS 7671.