Transformers explained: turns ratio, losses, ratings and 110 V site transformers

New to this? Read from the top. Already know the basics? Jump to Going deeper for intermediate and advanced detail.

A yellow 110 V site transformer next to a drawing of a transformer core with a 460-turn primary and a 24-turn secondary, turning 230 V into 12 V
Beginner

Transformers are everywhere in electrical work: the big ones on the grid, the one in your street, the yellow 110 V box on a building site, and the small ones inside doorbells, lighting and control panels. They all work the same way. This guide explains how, and the numbers you need to choose and use one.

How a transformer works

alternating flux Φ in the core230 Vprimary: 460 turnsload12 Vsecondary: 24 turns
Two windings on one steel core. The alternating flux made by the primary induces a voltage in the secondary.

A transformer has two coils of wire wound on the same steel core but not connected to each other. An alternating current in the primary winding makes an alternating magnetic flux in the core. That changing flux passes through the secondary winding and induces a voltage in it (Faraday's law). Energy crosses from one winding to the other through the magnetic field alone.

It only works with a changing current. Connect a transformer to DC and the flux doesn't change, so nothing is induced, and the primary acts like a short piece of wire: it overheats and burns out.

The turns ratio

Each turn of wire on the core has the same voltage induced in it, so the voltages are in proportion to the number of turns:

V1 ÷ V2 = N1 ÷ N2

A transformer with 460 turns on the primary and 24 on the secondary turns 230 V into 230 × 24 ÷ 460 = 12 V. Power in equals power out (less a few per cent of losses), so if the voltage goes down, the current goes up by the same ratio:

I1 ÷ I2 = N2 ÷ N1

A step-down transformer has fewer secondary turns; a step-up transformer has more. The same transformer can be used either way round if its insulation and ratings allow.

The EMF equation

How many turns a winding needs depends on the frequency and on how much flux the core can carry before it saturates:

E = 4.44 × f × N × Φmax

For the 230 V, 460-turn primary above on 50 Hz, the peak flux is 230 ÷ (4.44 × 50 × 460) ≈ 2.25 mWb. A transformer designed for 60 Hz has slightly less iron and fewer turns per volt; run it on 50 Hz and its core is pushed closer to saturation, so it runs hotter. Check the rating plate's frequency, especially on imported equipment.

Losses and efficiency

  • Iron (core) losses come from magnetising the core back and forth 50 times a second (hysteresis) and from currents induced in the core itself (eddy currents). The core is built from thin, insulated steel laminations to block eddy currents. Iron losses are roughly constant whenever the transformer is energised, even with no load.
  • Copper (winding) losses are I²R heating in the windings, so they rise with the square of the load current.

Large power transformers are over 99% efficient; small ones are less, and a small plug-in transformer might be 70 to 85%. A transformer left energised all year with no load still uses its iron losses all year.

Ratings: kVA, current and impedance

Transformers are rated in VA or kVA, not watts, because their heating depends on the current, whatever the power factor of the load. To find the current each side can deliver, divide the kVA by the voltage (single-phase) or by √3 × the line voltage (three-phase):

I = VA ÷ V    or    I = VA ÷ (√3 × Vline)

A 3.3 kVA, 230 V to 110 V site transformer can supply 3,300 ÷ 110 = 30 A on its secondary and draws about 3,300 ÷ 230 = 14.3 A from the 230 V supply at full load.

The percentage impedance on the rating plate (often shown as %Z or uk) is the percentage of rated voltage you'd need on the primary to push full-load current through a short-circuited secondary. It sets both how much the output voltage drops under load and the maximum fault current: roughly full-load current ÷ (%Z ÷ 100). The transformer calculator works out full-load currents and fault levels.

Inrush current

When a transformer is first switched on, its core can be driven briefly into saturation, depending on where in the cycle it's switched. For a few cycles it can draw many times its rated current, even with no load. That's why the circuit protecting a transformer often needs a Type C or D circuit-breaker, or a slower fuse, and why some toroidal transformers trip breakers at switch-on.

Types you'll meet

Common transformer types
TypeWhat it's for
Isolating transformerInput and output windings separated by double or reinforced insulation (protective separation), so the output isn't referenced to the supply's earth. A separating transformer has only basic insulation between them
Safety isolating transformerDouble or reinforced insulation between windings and an output at extra-low voltage (SELV), for example toy and bell transformers and SELV lighting supplies. (A bathroom shaver supply unit is an isolating transformer with a 230 V or 115 V output, not SELV.)
AutotransformerOne winding with a tapping, so input and output share conductors. Smaller and cheaper, but gives no isolation. Used for buck-boost and voltage adjustment
Current transformer (CT)Measures large currents for meters and protection relays; never open-circuit its secondary while the primary carries current
Voltage transformer (VT)Steps HV down to 110 V or 63.5 V for meters and relays
Distribution transformer11 kV to 433 V, oil-filled, Dyn11; see distribution substations

110 V centre-tapped earth: why site tools are yellow

230 V incentre tap earthedL1L255 V to earth55 V to earth110 V
A 110 V CTE transformer: 110 V between the two lines, but only 55 V from either line to earth.

Building sites in the UK run portable tools at 110 V from a centre-tapped earth (CTE) transformer. The 110 V secondary has its midpoint connected to earth, so each line is only 55 V from earth (63.5 V on three-phase CTE supplies). A person touching a damaged cable and standing on wet ground gets 55 V, not 230 V. BS 7671 calls this a reduced low voltage system, and the HSE recommends it for portable tools on construction sites. Plugs and sockets are the yellow BS EN 60309 industrial type, so 110 V tools can't be plugged into 230 V by mistake.

Because the secondary is fed only through the transformer, a 110 V site transformer is an isolating transformer: the output's only connection to earth is the centre tap. The yellow casing and the 16 A or 32 A outlets also make them easy to recognise; check the transformer's VA rating against the tools you'll run, remembering that big tools have high starting currents.

Intermediate and advanced

Going deeper

Equivalent circuit

A real transformer can be modelled as an ideal transformer with a few extra parts: series resistance and leakage reactance in each winding (most of the %Z), and a magnetising branch across the primary, made of a reactance (the current needed to magnetise the core) in parallel with a resistance (the iron losses). The open-circuit test measures the magnetising branch; the short-circuit test measures the series parts. Together they let you predict voltage regulation and efficiency at any load.

Voltage regulation

Regulation is how much the secondary voltage falls from no load to full load, as a percentage. It depends on the transformer's resistance and reactance and on the load's power factor: lagging loads give more drop, leading loads can make the voltage rise. That's why distribution transformers are wound for 433 V open circuit to deliver about 400 V under load.

Parallel operation

Two transformers can share a load only if they have the same voltage ratio, the same vector group (phase shift) and similar percentage impedance. A ratio mismatch drives a circulating current between them even with no load; an impedance mismatch makes the lower-impedance one take more than its share.

Sources

The main references behind this guide. Numbers we worked out ourselves, such as the code outputs, come from running the code.