Supply point testing simulator
The test sequence follows SSEN Distribution's Operational Safety Manual (OSM-069 Testing at LV Supply Points). Other DNOs' practice may differ in places.Follows SSEN’s supply point testing procedure; other DNOs may differ. About this simulator
About this simulator and how it works
Free demo: level 1 (3 jobs). Levels 2 to 4, the mystery call-outs and the fault bench are in the full version.
Test a three-phase service position the way SSEN does: switch the customer's load off, draw the cut-out fuses, lift the customer's earth lead and prove the supply with a test lamp, polarity tester, rotation meter and loop tester before and after the work. Find crossed phases, reverse polarity, a lost neutral, a high earth loop impedance or a backfeeding generator before anyone gets hurt.
How it works
You are an SSEN Competent Person at one meter position: a three-phase service cable from the LV main into a cut-out, meter tails to a three-phase meter, tails in trunking to the customer's isolator, and the customer's installation with two sockets and a three-phase machine. The customer's main earth lead runs from the cut-out's earthing terminal to their main earthing terminal and can be taken off for the loop test.
- Tap a tool (test lamp, polarity tester, multimeter, loop tester, rotation meter), then tap the test points on the drawing. Two-lead tools take two taps; the rotation meter takes three (brown, black, grey).
- Tap the plant to operate it: fuse carriers, the earth lead, the isolator, the sockets (to fit the plug-in polarity tester) and the machine. The same operations are listed as buttons.
- Level 1 walks through the pre-work checks, the post-work checks and a whole job. Level 2 adds service joints, SNE services and faults made by the work. Level 3 has faults waiting when you arrive. Level 4 has random call-outs and a fault bench where you choose the service and the faults.
Each job gives up to three stars: one for leaving the supply in the right state with the right people told, one for every check in the procedure, and one for no strikes, no slips and no hints. Three safety strikes stop the job, and some mistakes, such as giving a customer a supply with a lost neutral or reconnecting their earth lead to a live terminal, stop it at once.
The procedure it checks
The checks follow SSEN Distribution's public Operational Safety Manual. The main document is PR-NET-OSM-069 Testing at Low Voltage Supply Points (section 10.4, revision 1.00, March 2023).
- Pre-work checks (OSM-069 12.2): plug-in polarity tester in a socket as a reference (Appendix B); remove the cut-out fuses and, on PME, disconnect the customer's main earth lead from the PME earthing terminal; test polarity on the incoming side; check phase rotation; test the earth loop impedance; then fit empty fuse carriers or shrouds. OSM-027 asks for the load to be reduced where reasonably practicable before a fuse is withdrawn (9.2.6) and the meter isolator opened where fault current may exist (9.2.7); the customer's isolator is always opened before supply point testing.
- Test lamp (OSM-069 10.3 to 10.6): proved before and after use; incoming and outgoing sides tested; each phase to neutral and to earth, neutral to earth, and phase to phase. Phase to neutral or earth and phase to phase light, neutral to earth does not (Figures 10.2 to 10.5); an LED lamp shows more bars at 400 V than at 230 V (Figure 10.6), which the simulator shows as half light and full light. A dead result is confirmed by a second method, and a dead incoming supply means the cut-out is isolated and sealed.
- Voltage (OSM-069 11, Table 11.1): 216 to 253 V phase to neutral or earth, 376 to 440 V phase to phase, 0 to 6 V neutral to earth on SNE.
- Earth loop impedance (Appendix D): every phase; on SNE both phase to earth and phase to neutral. Maximum Ze for 100 A cut-out fuses: 0.25 Ω on networks built after 2016 (Table D.2); on older networks 0.35 Ω for PME and 0.8 Ω for a lead sheath or continuous earth wire (Table D.1).
- Phase rotation (Appendix C): SSEN standard rotation is anticlockwise with brown L1, black L2 and grey L3. The rotation is not changed once a three-phase customer is connected without their agreement.
- Post-work checks (OSM-069 13.3): test lamp, voltages, loop impedance and polarity at the cut-out; only then reconnect the earth lead; check rotation against the pre-work check (or have three-phase machines switched off if there was none); restore the fuses; check the plug-in tester in the same socket (or two sockets on different circuits); let the customer try a three-phase machine. SSEN also checks polarity on its own equipment with the fuses in (Appendix A item 10); polarity and rotation at the meter output and isolator are the meter operator's checks (OSM-083 9.3.5). Before switching the isolator on, the simulator asks you to run the polarity tester up each insulated meter tail; the tails and terminals are not touched.
- When something is wrong: reverse polarity or reversed rotation provided to a customer is reported to the Team Manager (OSM-069 8.4 and 14), and incorrect polarity found before work starts means isolating and informing the Team Manager (14.1); if it is put right before the investigation, photographs are taken before and after (14.3.5). Where it is caught before restoring, the simulator expects the same reporting and photographs as sensible practice. A metering problem is recorded and the customer and meter operator told (OSM-083 9.3.7); the supply is left isolated at the cut-out and the tails are not touched. A lost neutral is isolated at the cut-out with Fault Dispatch and the Team Manager notified (OSM-071 11.1.5), the customer told not to restore (11.1.1), and a damaged installation checked by an Appointed Electrician before restoration (11.3).
How accurate is it?
- The whole position, from the transformer to the customer's sockets, is solved as a complex 50 Hz circuit after every action. Every reading comes from that solution: voltages through each instrument's own input impedance, loop impedance as the impedance seen between the probes, and rotation from the phase angles.
- That is why a multimeter (10 MΩ) can read a near-normal voltage to a neutral that has come adrift, through the capacitance between the cores of the service cable, while a test lamp (modelled at 20 kΩ) gives no light. It is also why a loop test with the customer's earth lead still on reads through their pipework when the service neutral is open.
- Typical values are used: a 500 kVA transformer and an aluminium waveform main, a 35 mm² service, 241 V at the transformer, and around 30 Ω from the customer's earthed metalwork to true earth. The test lamp bar thresholds are the simulator's own, chosen to match OSM-069's "half light" at 230 V and "full light" at 400 V.
Things it simplifies: one three-phase service position, 100 A fuses, the people on site do what you ask, and the work in the middle happens off screen. Your company's own procedures, authorisation and Approved instruments always come first; this is a training game, not a substitute for them.