Find the buck-boost transformer you need to raise (boost) or lower (buck) a supply voltage to suit your equipment. Enter the supply, the voltage the load needs and the load, and the calculator picks the winding connection, shows the real output voltage, and sizes the transformer in kVA, for single-phase and three-phase.

  • Electrical tool
  • Runs in your browser
  • Tested 25 November 2026
  • Sources
For three-phase, enter line-to-line voltages.
Measure it with the load running.
From the equipment nameplate.
From the equipment nameplate.

What a buck-boost transformer is

A buck-boost transformer is a small single-phase transformer with two primary windings and two low-voltage secondaries, for example 120 × 240 V to 12/24 V. Wired normally, it's an ordinary isolating transformer for control or low-voltage lighting circuits. Wired as an autotransformer, with the secondary connected in series with the primary, it adds its secondary voltage to the supply (boost) or takes it away (buck). That's a simple way to run, say, 230 V equipment on a 208 V supply.

Because only the secondary's share of the power passes through the transformer's own windings, a small unit can supply a much bigger load: a 1 kVA unit boosting 208 V to about 230 V will run a 9.6 kVA load. The price is that the output isn't isolated from the supply, and a buck-boost transformer cannot create a neutral.

The output voltage

With the primary rated Vp and the secondary connected for Vs:

  • Boost: the supply goes across the primary and the secondary adds to it. Vout = Vin × (Vp + Vs) ÷ Vp
  • Buck: the connection is turned round. The supply goes across both windings in series and the load is taken from the primary. Vout = Vin × Vp ÷ (Vp + Vs)

So a buck isn't simply the supply minus the secondary voltage. A 240 V primary with a 24 V secondary bucks 240 V to 240 × 240 ÷ 264 = 218.2 V, not 216 V. The makers' charts show the same: 230 V bucked this way gives 208 V (209.1 V exactly), and 250 V gives 227 V.

Some chart columns are labelled with the nominal system voltage rather than the exact figure. For example, the 16/32 V unit's "208 V to 240 V" boost actually gives 235.7 V, and its "240 V to 208 V" buck gives 211.8 V. This calculator always shows the real output, so you can check it against the load's tolerance.

Sizing the transformer

The size on the nameplate (the transformer's own kVA) isn't the size of the load it can run. What limits it is the current in the series winding, which can carry the nameplate rating divided by the secondary voltage as connected: IX = kVA × 1000 ÷ Vs. A 0.25 kVA unit, for example, gives 10.4 A at 24 V or 20.8 A at 12 V.

  • In a boost connection, the load current flows through the secondary, so the transformer needs kVA = Iload × Vs ÷ 1000.
  • In a buck connection, the supply current flows through it instead. That's a little smaller than the load current: IX = Iload × Vp ÷ (Vp + Vs).
Worked example. Equipment rated 230 V, 40 A on a 208 V single-phase supply. A 120 × 240 V, 12/24 V unit with its primary connected for 240 V and its secondaries in series for 24 V boosts 208 V to 208 × 264 ÷ 240 = 228.8 V, a 10 % boost. The secondary carries the 40 A load current, so the transformer needs 40 × 24 ÷ 1000 = 0.96 kVA. The next standard size is 1 kVA, which can carry 41.7 A and run up to 230 × 41.7 = 9.58 kVA of load, the same figure as the maker's chart.

Three-phase

Three-phase supplies use two or three single-phase buck-boost transformers wired together:

  • Open delta, two transformers, for a 3-wire supply and a load that doesn't need a neutral. Each transformer works across a pair of lines, so the voltage change is the same as single-phase. For example, two 1 kVA units boost 208 V to 230 V for 41.7 A per line, a 16.6 kVA load.
  • Wye, three transformers, one per phase with the common point on the neutral, for a 4-wire supply. Each primary sees the line-to-neutral voltage. For example, three 1 kVA units with their primaries on 120 V and secondaries at 12 V boost 208Y/120 V to about 230 V for 83.3 A per line, a 33.2 kVA load. The makers' charts only use this connection for boosting.

In both cases each transformer is sized from the line current through its series winding, just as for single-phase.

Things to know

  • Buck-boost transformers suit a fixed change of about 5 to 20 %. If the supply voltage swings a lot, the output swings with it.
  • Frequency. The supply frequency must match the equipment. Many buck-boost transformers are made for North American 60 Hz supplies. In Acme's range, only the sizes up to 0.75 kVA are rated for 50 Hz as well, so on a 50 Hz supply check the rating plate.
  • Motors. Acme's guidance is to increase the transformer size by 20 % if a motor is started more than once an hour.
  • Measure the supply voltage with the load running. It can be several volts lower than with nothing switched on.
  • Connect the windings exactly as the maker's diagram shows. With the secondary the wrong way round, a boost connection bucks instead.
  • Protect the transformer and the circuit as the maker's chart and your wiring rules require.
  • Never use an autotransformer, such as a buck-boost connection, to make a reduced low voltage (110 V) site supply in the UK. BS 7671 Regulation 411.8 requires an isolating transformer as the source.

For the full-load current and fault level of an ordinary isolating transformer, use the transformer current and fault level calculator.

Sources

Where the formulas and figures on this page come from. We test every tool against worked examples from these before publishing.