A home charge point is the biggest single load most houses will ever have. A typical 7 kW charger draws 32 A for hours at a time, every night. That's why it needs its own circuit and some protection you won't find on an ordinary socket. This guide explains what's involved, so you know what a good installation looks like and what to ask an installer.
How fast will it charge?
| Charger | Current | Power | Range added per hour (at about 3.5 miles per kWh) |
|---|---|---|---|
| Three-pin plug ("granny" lead) | Usually limited to about 10 A | About 2.3 kW | About 8 miles |
| Home charge point, single phase | 32 A | 7.4 kW (230 V × 32 A = 7.36 kW) | About 26 miles |
| Three-phase charge point | 32 A per phase, 400 V | 22 kW (if the car accepts it) | Limited by the car's on-board charger |
Most UK homes have a single-phase supply, so 7 kW is the usual choice. Topping up a 60 kWh battery from 20% to 80% (36 kWh) takes about five hours at 7.4 kW, a little longer once charging losses are counted. A three-pin plug is fine for occasional use, but the socket and plug run at a high current for hours, so it's worth checking the socket is in good condition and never using an extension lead.
What the installation needs
The rules are in BS 7671 Section 722, "Electric vehicle charging installations", plus the IET Code of Practice for EV charging equipment installation. In plain terms:
- A dedicated circuit. Each charge point gets its own final circuit and overcurrent device, designed to carry the full rated current. No diversity is applied to the charger circuit, because it really will run at 32 A for hours.
- A 30 mA RCD for each charging point, of at least Type A. A Type AC RCD isn't allowed.
- Protection against DC leakage. A car's charger can leak smooth DC current to earth, which can blind an ordinary Type A RCD. So the circuit also needs either a Type B RCD, or a Type A RCD with a residual direct current detecting device (RDC-DD) that trips at 6 mA DC. Most domestic chargers have the 6 mA DC detection built in, so a Type A RCD (often a Type A RCBO) is enough. Amendment 4 (2026) also lists a residual direct current protective device (RDC-PD) to BS IEC 62955 as a further option.
- No AFDD needed. Amendment 4 added Regulation 722.421.1.7.201, which makes clear that arc fault detection devices aren't required on circuits supplying EV charging equipment with BS EN IEC 62196-2 sockets or connectors.
- Equipment suitable for outdoors, with the right IP rating and protection against impact where cars or bins could hit it.
PME supplies and the broken-PEN problem
Most UK homes have a TN-C-S (PME) supply, where the supplier's neutral and earth share one conductor in the street, the PEN. If that conductor breaks, the earth terminal in your house can rise towards 230 V. Inside, that's managed by bonding. Outside, someone touching the car while standing on the ground could get a shock, because the car's body is connected to the house earth through the charging cable.
So BS 7671 Regulation 722.411.4.1 says a PME earth can't be used for a charge point that can charge a car outdoors unless one of its listed protective measures is in place. In practice, installers use one of these:
- A charger with open-PEN protection built in. This is now the most common route. The charger watches the voltage, and if it goes outside the limits that point to a broken PEN, it disconnects the line, neutral and protective conductor to the car within 5 seconds. For the method in indent (iv) of the regulation, the limits are 207 V and 253 V.
- A separate earth electrode, making the charge point a TT system on its own, kept apart from the PME-earthed metalwork.
- A separate open-PEN protection device on the charge point's circuit, for chargers that don't have one built in.
If the house is already TT, there's no broken-PEN issue, but the earth electrode resistance has to suit the RCD.
Cable size and voltage drop
A charger with a built-in open-PEN device reads the voltage at the charger, not at the meter, so voltage drop in the cable matters. The UK supply can legally be as low as 216.2 V (230 V −6%). Add a 5% drop in the cable and the charger sees 204.7 V, below its 207 V threshold, so it can trip when nothing is wrong. The IET suggests designing for about 3% drop instead. Using its figures for two-core 70 °C SWA at 32 A, that gives these maximum lengths:
| Conductor size | mV/A/m | Maximum length |
|---|---|---|
| 4 mm² | 11 | 19 m |
| 6 mm² | 7.3 | 29 m |
| 10 mm² | 4.4 | 49 m |
| 16 mm² | 2.8 | 77 m |
The cable also has to carry 32 A for the way it's installed, and the earth fault loop impedance has to suit the protective device. Check the terminals in the charger can take the size you pick. You can check your own figures with the cable voltage drop calculator.
Is the supply big enough?
Many homes have a 60 A, 80 A or 100 A main fuse. Adding 32 A on top of cooking, showers and heating can overload a small supply, so the installer should do a maximum demand calculation. Many chargers can measure the whole-house current with a clamp and turn themselves down when the house is busy. This is called load management or load curtailment.
The local distribution network operator (DNO) must be told about a charge point. Under the Energy Networks Association process, if it's a single new device and the home's maximum demand stays within the limits (typically 60 A per phase), the installer can connect it and notify the DNO within 28 days. Otherwise they must apply and wait for approval first. Your installer handles this.
Smart charger rules
Since 30 June 2022, charge points sold for home and workplace use in Great Britain must meet the Electric Vehicles (Smart Charge Points) Regulations 2021. They must:
- be able to connect to the internet and change their charging rate or time in response to signals, and keep charging if the connection is lost;
- come with default charging hours outside the peak hours of 8 am to 11 am and 4 pm to 10 pm on weekdays, which you can accept, change or remove;
- apply a random delay of up to 10 minutes (600 seconds) when they start or change the charging rate, which you can cancel, to stop thousands of chargers switching at once;
- measure and show you the energy used, and meet security requirements.
Building regulations and grants
- A new circuit for a charge point is notifiable under Part P of the Building Regulations in England and Wales. A registered electrician self-certifies it and you get a certificate and building regulations compliance notice.
- Since 15 June 2022, Approved Document S requires new homes in England with parking to have a charge point of at least 7 kW.
- The government's chargepoint grants run until 31 March 2027. The grant for renters and flat owners with private off-street parking, and the grant for homes with only on-street parking that use a cross-pavement solution, each give up to £500. Check gov.uk for eligibility before you book.
How high should a charge point be mounted?
BS 7671 used to give a mounting height for EV socket-outlets, but that requirement was removed in Amendment 1 (2020). The IET's guidance now points to BS 8300, which puts the socket-outlet or connector between 0.75 m and 1.2 m above the finished floor or ground, with the top of any display between 1.2 m and 1.4 m. That range keeps the connector easy to reach, including for wheelchair users. The IET Code of Practice for EV charging equipment installation gives more detail, and the charger maker's instructions also apply.
Can you have a DC charger at home?
Almost every home charge point is AC. It feeds mains electricity to the car, and the car's own on-board charger converts it to DC for the battery, which is why the car sets the top charging speed. A DC charger does that conversion in the wall unit instead and feeds the battery directly.
DC chargers for homes do exist, but they cost far more, and at home they aren't faster. Public rapid chargers start at 50 kW, while a typical house with a 100 A supply fuse can draw only about 23 kW (100 A × 230 V) for everything, so a home DC unit has to run at a similar power to an AC charge point. The main reason to fit one is two-way charging (vehicle-to-home or vehicle-to-grid), where some systems use a DC bidirectional charger. A home DC charger still has to meet the smart charge point rules above, which leave out only public charge points and rapid ones of 50 kW or more.
Can you install your own EV charger?
In England, the law doesn't stop a homeowner installing a charge point, but it isn't a simple DIY job:
- Building regulations. The charger needs a new circuit, which is notifiable under Part P. If you aren't registered with a competent person scheme, you must give building control a building notice or full plans application before you start and pay their fee. They'll inspect the work and may want test results to BS 7671, so you need to be able to test and certify it, or pay someone who can. See Part P notifiable work.
- The technical rules. All of the above applies: Section 722 of BS 7671, the right RCD protection, the PME open-PEN requirement, cable sizing and a maximum demand check. Getting the earthing wrong on a PME supply is the mistake that can make the car body dangerous.
- The network operator. The DNO still has to be told about the charger, under the connect and notify process, or asked first if the house's maximum demand would be too high.
- Grants. The government chargepoint grants are claimed by the installer, and the charger mustn't be fitted until OZEV has confirmed you're eligible.
- Smart charger rules. The Smart Charge Points Regulations apply to charge points sold by a business, so the charger you buy must already be compliant. They don't stop you fitting it yourself.
For most people, a registered electrician who installs charge points regularly is the simpler route: they self-certify the work, notify the DNO and can claim the grant.
What you should get at the end
- An Electrical Installation Certificate with test results for the new circuit, including RCD trip times and earth fault loop impedance.
- A note of how the broken-PEN requirement was met (built-in device, earth electrode or separate device).
- Confirmation the DNO has been notified, and the charger's app and default charging hours set up.
Sources
The main references behind this guide. Numbers we worked out ourselves, such as the code outputs, come from running the code.
- BS 7671:2018+A4:2026 Section 722, electric vehicle charging installations (IET, paid standard)
- IET Wiring Matters, July 2023: How voltage drop can affect EV charging point open PEN detection devices
- NICEIC: Understanding BS 7671:2018+Amendment 4:2026 (changes and FAQs, including FI and AFDD terminology)
- SELECT: So what's new? Overview of BS 7671:2018+Amendment 4:2026
- BEAMA (via EDA): BS 7671:2018+A4:2026 overview, including AFDD and Section 722 changes
- Electrical Safety First Best Practice Guide 4: Electrical installation condition reporting, classification codes (Issue 7.4, August 2026)
- The Electric Vehicles (Smart Charge Points) Regulations 2021, Part 2
- The Electric Vehicles (Smart Charge Points) Regulations 2021, regulations 3 and 4: which charge points they apply to (sales by a business; not public or rapid 50 kW+ charge points)
- GOV.UK: Electric vehicle chargepoint grants (updated 1 April 2026)
- GOV.UK: Changes to electric vehicle chargepoint grant schemes from 1 April 2026 (installer claims; do not install before OZEV confirms eligibility)
- GOV.UK: Approved Document S, infrastructure for charging electric vehicles
- Energy Networks Association: connecting EV charge points and heat pumps (connect and notify), FAQs
- IET: Electric vehicle charging installations FAQs (mounting height, BS 8300 0.75 to 1.2 m)