Overhead lines vs underground cables: costs, faults, ratings and why pylons are still built

New to this? Read from the top. Already know the basics? Jump to Going deeper for intermediate and advanced detail.

A lattice steel pylon carrying overhead conductors on one side, and a cutaway trench with three buried cables under marker tape on the other
Beginner

Whenever a new line of pylons is proposed, people ask why the cables can't just go underground. Sometimes they do. But for most long high-voltage routes, overhead lines are still chosen, and the reasons are physics and cost, not just habit. This guide explains the trade-offs.

overhead linebare conductors,cooled by the airmarker tapeunderground cablecover tilessand bed
An overhead line uses air for insulation and cooling. A buried cable needs solid insulation and gets rid of its heat through the soil.

How each one works

An overhead line uses bare aluminium conductors (often with a steel core for strength) held on insulators. The air around them is the insulation, and the wind cools them. Keeping the conductors far enough apart and high enough above the ground is what keeps them safe.

An underground cable needs solid insulation, such as XLPE, thick enough to withstand the full voltage, a metal screen, and a protective sheath. All the heat from its losses has to pass through the insulation and then the soil, which is a much worse cooler than moving air. So for the same current, a cable needs a bigger conductor, and high-voltage routes often need several cables in parallel per phase.

Cost

Overhead line£2.2m to £4.2m per kmBuried cable£10.2m to £24.1m per kmlifetime cost, 400 kV, 2012 prices (IET / Parsons Brinckerhoff)
Lifetime costs include building, maintenance and the value of losses over 40 years.

The best-known UK comparison is the Electricity Transmission Costing Study, carried out by Parsons Brinckerhoff with independent review by the IET and published in 2012. For 400 kV routes it found that underground cable cost around ten times as much per kilometre to build as an overhead line. Over a 40-year life, including maintenance and losses, the gap narrowed to about five times: roughly £2.2m to £4.2m per km for overhead lines against £10.2m to £24.1m per km for directly buried cable (2012 prices). The study also warned that simple ratios can mislead, because the real figure depends heavily on the route. Those costs are ultimately paid by electricity customers.

Cable capacitance: why long AC cables are hard

A cable is a long capacitor: a conductor separated from an earthed screen by a thin layer of insulation. Every kilometre of high-voltage AC cable draws a charging current just to charge and discharge that capacitance 50 times a second. On a long route, the charging current uses up much of the cable's current rating before any useful power is sent, and reactors are needed to compensate. Overhead lines have their conductors far apart in air, so their capacitance per kilometre is far lower.

That's why long subsea and very long underground links use HVDC: with direct current there's no continuous charging current, so cable length isn't limited the same way. The converter stations at each end are expensive, so HVDC pays off over long distances.

Faults and reliability

  • Overhead lines are exposed to lightning, wind, trees and birds, so they fault more often. But most of those faults are transient: the arc clears once the line is switched off for a moment. That's why overhead lines use auto-reclosers, which trip and reclose automatically and restore supply in seconds. When a line is damaged, it's usually easy to find and repair.
  • Underground cables are protected from the weather and fault less often, but their faults are almost always permanent: damaged insulation doesn't heal. The fault has to be located with specialist equipment, the road or field dug up and a joint made, which can take days on high-voltage cables. So auto-reclosing is normally not used on cable circuits.

The most common cause of damage to underground cables is digging. Anyone excavating near cables must get cable plans first and use a cable locator: see cable detectors.

Where each is used

In towns and cities, almost all distribution is underground, because there's no space for overhead lines and the routes are short. In the countryside, 11 kV and 33 kV lines on wooden poles are common, because they're cheap to build over long distances to scattered customers. Transmission routes are mostly overhead, with cables used where an overhead line isn't acceptable: in cities, across protected landscapes, and where lines are put underground to reduce their visual impact.

Staying safe

  • Never touch or approach an overhead line, even a low one. Electricity can arc across a gap, and a line that looks insulated may not be.
  • Keep machinery, ladders, scaffold poles, fishing rods and kites well away from overhead lines. If a line comes down, stay well away and call 105.
  • Before any digging, find out where cables are. Treat every cable you uncover as live.

To learn how lines are switched and earthed for work, see HV switching and safety documents.

Intermediate and advanced

Going deeper

Sag and thermal rating

An overhead conductor gets longer as it heats, so it sags lower. A line's current rating is often set by how hot the conductor can get before it sags too close to the ground, not by the metal itself. Ratings are higher in winter, when the air is cold, and some networks now rate lines dynamically using measured weather.

Cable ratings depend on the soil

A cable's rating depends on the thermal resistivity of the soil around it. Dry, sandy soil holds heat in; damp clay lets it out. Cables are often bedded in a special backfill so they don't dry out the soil around them, which would make them run hotter.

Compact and insulated overhead lines

At low voltage, aerial bundled conductor (ABC) twists insulated cores together on a single support. At higher voltages, newer pylon designs, such as T-pylons, are lower and more compact than the traditional lattice tower, which reduces their visual impact.

Sources

The main references behind this guide. Numbers we worked out ourselves, such as the code outputs, come from running the code.