Main protective bonding: green and yellow 10 square millimetre conductors run from the main earthing terminal next to the consumer unit to clamps on the gas pipe within 600 millimetres of the meter and on the water pipe where it enters the building
Beginner

Look under the stairs or by the meter in most UK homes and you'll find green and yellow cables clamped to the gas and water pipes. That's main protective bonding. It's easy to overlook, but it's one of the most important safety measures in an installation. This guide explains what it does and what BS 7671:2018+A4:2026 requires.

Earthing and bonding aren't the same thing

  • Earthing connects the exposed-conductive-parts of the electrical installation, such as metal light fittings and appliance cases, to the main earthing terminal through circuit protective conductors (cpcs). If a line conductor touches the metal, the fault current flows back through the cpc and the protective device disconnects the supply.
  • Bonding connects extraneous-conductive-parts, metalwork that isn't part of the electrical installation but can bring in a potential from outside, usually earth potential, to the main earthing terminal. The aim is to keep everything you can touch at about the same voltage during a fault, so there's no dangerous voltage between, say, a faulty appliance and a water pipe.

During a fault, the earthed metalwork can rise to a significant voltage above true earth until the protective device operates. Bonding makes the pipes rise with it, so the voltage between them stays low.

What needs main bonding

Regulation 411.3.1.2 lists the extraneous-conductive-parts to be connected to the main earthing terminal, including:

  • water installation pipes;
  • gas installation pipes;
  • other installation pipework and ducting, such as oil;
  • central heating and air conditioning systems;
  • exposed metallic structural parts of the building;
  • a lightning protection system, where there is one, in line with BS EN 62305.

The test is whether the part is actually extraneous: liable to bring in a potential. A metal water pipe that enters the building in metal almost certainly is. Copper pipework fed by a plastic supply pipe often isn't, and bonding it may not be needed. Deciding needs a measurement and judgement by a competent person, not a guess.

Where the bonding clamps go

Regulation 544.1.2 says the main bonding connection to gas, water and other services should be made as near as practicable to where the service enters the building. Where there's a meter, isolating point or insulating section, the connection goes on the consumer's side, before any branch pipework, and where practicable within 600 mm of the meter outlet union, or at the point of entry if the meter is outside.

Use a clamp to BS 951 and fix the label "Safety Electrical Connection – Do Not Remove" at or near the connection (Regulation 514.13.1). Bonding conductors should be continuous where practicable, and can loop from one service to the next without being cut, so that removing one clamp doesn't disconnect the others.

What size bonding conductor?

PME (TN-C-S) supplies

For a PME supply, Regulation 544.1.1 sizes main bonding from the supply's PEN conductor using Table 54.8, not from the circuit sizes. Distribution network operators may require larger sizes, so check their requirements too.

Minimum main protective bonding for PME supplies (Table 54.8, copper)
Supply PEN conductor (copper equivalent)Main bonding conductor
35 mm² or less10 mm²
over 35 mm², up to 50 mm²16 mm²
over 50 mm², up to 95 mm²25 mm²
over 95 mm², up to 150 mm²35 mm²
over 150 mm²50 mm²

A typical house has a 25 mm² or 35 mm² supply, so 10 mm² is the usual size for domestic PME main bonding. The PEN conductor's size is often hard to confirm, so the size of the meter tails is commonly used as a guide.

TN-S and TT supplies

Main bonding must be at least half the cross-sectional area required for the earthing conductor, and not less than 6 mm². It need not exceed 25 mm² copper. Many electricians fit 10 mm² regardless, which makes a later change to PME simpler.

Older homes often have 6 mm² bonding, which was the norm before PME bonding sizes increased. Whether that's acceptable on a condition report depends on the supply type, so it's a judgement for the inspector. More on supply types in earthing systems explained.

Why bonding matters more with PME

On a PME supply, the installation's earth is connected to the supply neutral. If the PEN conductor in the street breaks, the earthed and bonded metalwork in the house can rise towards line voltage. Bonding then carries current that would otherwise flow through a person touching a tap. It's also why charge points for electric vehicles and outdoor supplies on PME need special care: see EV charger installation.

Testing the bonding

Bonding conductors are tested for continuity with a low-resistance ohmmeter, from the main earthing terminal to each clamp, as part of initial verification and periodic inspection. The reading should be low and consistent with the conductor's length: 10 mm² copper is about 1.83 mΩ per metre at 20 °C, so a 5 m run measures about 0.009 Ω plus the test lead and clamp resistances. A high or unstable reading points to a loose or corroded clamp. Absent main bonding to gas or water is normally recorded as potentially dangerous (C2) on a condition report: see EICR codes explained.

Supplementary bonding

Supplementary bonding links exposed- and extraneous-conductive-parts that can be touched at the same time within a location, rather than back to the main earthing terminal. It's an additional protection measure (Regulation 415.2).

In a room containing a bath or shower, Regulation 701.415.2 allows supplementary bonding to be left out where all of these apply: every circuit in the location meets the required disconnection times, every circuit has 30 mA RCD protection, and all extraneous-conductive-parts in the location are effectively connected to main protective bonding. With modern RCD-protected installations, most bathrooms meet those conditions. See bathroom zones explained.

Where supplementary bonding is fitted, Regulation 544.2.3 gives the minimum for a conductor joining two extraneous-conductive-parts: 2.5 mm² copper if mechanically protected, 4 mm² if not.

Intermediate and advanced

Going deeper

How big is the touch voltage without bonding?

Consider a line-to-earth fault on a TN system. The fault current flows through the line conductor and back through the cpc. Because the cpc is often smaller than the line conductor, more than half of the fault voltage can appear across it. In 2.5/1.5 mm² cable, the 1.5 mm² cpc has 12.10 ÷ 7.41, about 1.6 times the resistance of the 2.5 mm² line conductor. Ignoring the supply's own impedance, that puts up to about 60% of U0, around 140 V at 230 V, between the faulty appliance and the main earthing terminal's potential. Bonding the pipes to the same main earthing terminal brings their potential up with the earthing system, so the voltage between the appliance and a pipe is limited to the drop along the cpc from the MET to the appliance, not the full rise.

Supplementary bonding effectiveness

Regulation 415.2.2 gives the check for whether supplementary bonding is effective: the resistance R between simultaneously accessible exposed- and extraneous-conductive-parts must satisfy R ≤ 50 V ÷ Ia in AC systems, where Ia is the operating current of the protective device. For an RCD, Ia is the rated residual operating current IΔn, so for a 30 mA RCD R may be up to about 1,667 Ω. For a circuit-breaker, Ia is the current that causes operation within 5 s.

Supplementary bonding conductor sizes

Regulation 544.2 sets three cases. Between two exposed-conductive-parts: no smaller than the smaller cpc. Between an exposed-conductive-part and an extraneous-conductive-part: at least half the cpc. Between two extraneous-conductive-parts: 2.5 mm² with mechanical protection, 4 mm² without.

Telling whether a part is extraneous

Guidance such as the IET's Guidance Note 8 describes measuring the insulation resistance from the metal part to the main earthing terminal. A very high resistance shows the part isn't bringing in an earth potential, so it isn't extraneous and needn't be bonded. Bonding something that isn't extraneous can itself introduce a risk, because it may bring the installation's earth potential to places where people are in contact with true earth.