Home / Learn / Electrical installations

Bathroom zones explained: zones 0, 1 and 2, IP ratings and what's allowed where

New to this? Read from the top. Already know the basics? Jump to Going deeper for intermediate and advanced detail.

Bathroom zones from the side: zone 0 inside the bath, zone 1 above it up to 2.25 metres, zone 2 a 0.6 metre band beyond zone 1, and no ordinary socket-outlets within 2.5 metres of the zone 1 boundary
Beginner

Water and electricity don't mix, so rooms containing a bath or shower are a "special location" in BS 7671, covered by Section 701. The room is divided into zones based on how likely things are to get wet, and each zone has its own rules. This guide sets out the zones under BS 7671:2018+A4:2026 and what you can install in each.

The zones

ZoneWhere it is
Zone 0Inside the bath or shower tray. For a shower without a tray, zone 0 is 0.10 m high and covers the same floor area as zone 1.
Zone 1Directly above zone 0, up to 2.25 m above the finished floor, or up to the highest fixed shower head or water outlet if that's higher. For a shower without a tray, zone 1 extends 1.2 m horizontally from the centre of the fixed water outlet.
Zone 2A band 0.6 m wide horizontally around zone 1, also up to 2.25 m high. There's no zone 2 for a shower without a tray, because its zone 1 is enlarged instead.
Outside the zonesThe rest of the room. The general rules still apply, plus the Section 701 rules for the whole location.

The space under a bath counts as zone 1 if it can be reached without a tool. If the bath panel can only be removed with a tool, the space under it is outside the zones. Fixed partitions such as a shower screen can limit the zones, because the zone stops at the barrier.

IP ratings

The IP code shows how well equipment keeps out solids (first digit) and water (second digit). "X" means that property hasn't been rated. Section 701 requires at least:

  • IPX7 in zone 0 (protected against temporary immersion);
  • IPX4 in zones 1 and 2 (protected against splashing from any direction);
  • IPX5 where water jets are likely to be used for cleaning, as in communal showers.

What's allowed in each zone

Zone 0

Only equipment designed for use in zone 0, supplied by SELV at no more than 12 V AC or 30 V ripple-free DC, with the safety source outside zones 0, 1 and 2. No switches or sockets.

Zone 1

Only fixed, permanently connected equipment suitable for the zone, such as:

  • electric showers and shower pumps;
  • whirlpool baths;
  • ventilation equipment (extractor fans);
  • towel rails and water heating appliances;
  • luminaires;
  • equipment supplied by SELV or PELV at no more than 25 V AC or 60 V ripple-free DC.

Switches are only permitted in zone 1 if they're part of a SELV circuit at no more than 12 V AC or 30 V DC, with the source outside the zones. In practice, light switches go outside the room, or a ceiling pull-cord switch is used.

Zone 2

Fixed equipment suitable for the zone. Switches and socket-outlets of SELV circuits are allowed, and so are shaver supply units to BS EN 61558-2-5, which have an isolating transformer. Ordinary 13 A sockets are not.

Socket-outlets: the 2.5 m rule

Apart from SELV socket-outlets and shaver supply units, socket-outlets are prohibited within 2.5 m horizontally of the boundary of zone 1. This was 3 m until Amendment 2 of 2022 reduced it, and plenty of older guidance still says 3 m. In a small bathroom, that rule usually means there's nowhere a 13 A socket can go. A 13 A socket in a large bathroom, more than 2.5 m from zone 1, must still have 30 mA RCD protection.

RCDs and bonding

  • Every low-voltage circuit of the location must have 30 mA RCD protection (Regulation 701.411.3.3), including lighting, the shower and the fan.
  • Supplementary bonding can be left out if all circuits in the location meet the disconnection times, all have 30 mA RCD protection, and all extraneous-conductive-parts, such as metal pipes entering the room, are effectively connected to main protective bonding. Otherwise it's required. See main protective bonding explained.

Practical points

  • Downlights over a bath or shower are in zone 1 if the ceiling is no higher than 2.25 m, or if the fixed shower head is higher than the ceiling, and then they need to be IPX4 or better. Many people fit IP65 fittings throughout for simplicity.
  • An extractor fan in zone 1 must be suitable for it; fans with a separate SELV transformer are common.
  • Electrical work in a bathroom can be notifiable building work in England. See Part P notifiable work.
  • Always follow the equipment maker's instructions as well as the zone rules.
Intermediate and advanced

Going deeper

Why the zones are drawn the way they are

Wet skin has a much lower resistance than dry skin, and a person in a bath has a large contact area with water at earth potential, so a touch voltage that would be harmless elsewhere can drive a dangerous current. The zones reflect where people and equipment get wet: zone 0 is immersion, zone 1 is direct spray, zone 2 is splashes and wet hands. SELV limits in zone 0 (12 V AC) are lower than in zone 1 (25 V AC) for that reason.

Electric floor heating

Section 701 allows electric floor heating, with conditions on its construction: the heating cables or elements need a metal sheath, enclosure or fine-mesh metallic grid connected to the protective conductor of the supply circuit. They also need the 30 mA RCD protection the location requires. Follow the heating maker's instructions for wet rooms.

What changed in Amendment 2 (2022)

The 18th Edition moved the socket-outlet distance from 3 m to 2.5 m, and older 16th Edition practices had already gone before that: the old "zone 3" was removed by the 17th Edition in 2008. People sometimes still talk about zone 3 out of habit; it no longer exists. The IET's overview of the changes in Amendment 4 (2026) doesn't list any change to Section 701.

Sources

The main references behind this guide. Numbers we worked out ourselves, such as the code outputs, come from running the code.