Solar panels turn daylight into electricity. On a UK house they typically supply a good share of the electricity you use from spring to autumn and very little in midwinter. This guide explains how a system works, how much it really generates where you live, and the rules that apply. To see the numbers for your own roof, use the solar panel and battery calculator.
How a solar PV system works
Each panel is made of silicon cells. Light knocks electrons loose in the silicon, and the cell's built-in electric field pushes them out as a direct current (DC). Panels are wired together in strings, which add their voltages, often to several hundred volts DC on a house roof.
An inverter turns that DC into 230 V AC in step with the mains, and feeds it into your consumer unit through its own circuit. Your home uses the solar first. When the panels make more than the house is using, the extra flows out to the grid through your meter (export). When they make less, the grid tops you up as usual. You never have to switch anything.
kWp: what the size means
A panel's rating, in watts, is its output under standard test conditions: sunshine of 1,000 W per square metre on a panel at 25 °C. A system's size is the total of its panels in kilowatts peak (kWp). Ten 400 W panels make a 4 kWp system. On a real roof the panels rarely see test conditions, so a 4 kWp system spends most of its time well below 4 kW. What matters is the energy it makes over a year, in kWh.
How much a UK roof generates
These figures come from PVGIS, the European Commission's free solar database, for a south-facing roof pitched at 30°, with its standard allowance of 14% for system losses. They are long-term averages, so a dull year will come in lower and a sunny year higher.
| City | Per kWp, south, 30° | 4 kWp, south | 4 kWp, half east, half west |
|---|---|---|---|
| Southampton | 1,056 | 4,222 | 3,410 |
| Exeter | 1,045 | 4,179 | 3,393 |
| Cardiff | 1,034 | 4,137 | 3,337 |
| Norwich | 1,022 | 4,086 | 3,271 |
| London | 1,010 | 4,041 | 3,255 |
| Birmingham | 960 | 3,840 | 3,106 |
| Newcastle | 937 | 3,747 | 2,971 |
| Belfast | 911 | 3,642 | 2,938 |
| Edinburgh | 893 | 3,572 | 2,844 |
| Manchester | 880 | 3,519 | 2,876 |
| Aberdeen | 877 | 3,508 | 2,762 |
| Glasgow | 845 | 3,382 | 2,746 |
| Inverness | 803 | 3,214 | 2,609 |
The south of England and Wales generate the most. Inverness gets about 76% of what Southampton gets, which is less of a gap than many people expect, because long summer days in the north make up for some of the weaker sun.
The seasons matter more than the region. In London a south-facing 30° roof makes about 3.7 times as much in June as in December. Solar can cover most of a home's daytime use in summer, and very little in winter, which is also when you use the most.
Direction and pitch
South is best, but east and west roofs still work well. This is London, as a share of the best case (south, 30°):
| Faces | Pitch 15° | Pitch 30° | Pitch 45° |
|---|---|---|---|
| South | 951 (94%) | 1,010 (100%) | 1,019 (101%) |
| South-east | 923 (91%) | 964 (95%) | 963 (95%) |
| South-west | 913 (90%) | 945 (94%) | 937 (93%) |
| East | 843 (83%) | 827 (82%) | 790 (78%) |
| West | 827 (82%) | 800 (79%) | 757 (75%) |
An east and west split (half the panels on each side of the roof) makes about 81% of a south roof's output, but spreads it across the morning and evening, which can suit a household that is out in the middle of the day. North-facing roofs are usually poor value in the UK.
Shading cuts output far more than these tables suggest. In a string of panels, the weakest panel can drag down the rest, so a chimney shadow over one panel can cost much more than one panel's share. A good installer does a shade assessment, and may use optimisers or microinverters where shade can't be avoided.
Inverter types
- String inverter. One box, usually in the loft or garage, for one or more strings. The cheapest and most common. A shaded panel affects the whole string.
- Optimisers. A small unit behind each panel lets each one work at its own best point, feeding a string inverter. Good for partly shaded roofs, and they give panel-by-panel monitoring.
- Microinverters. A small inverter behind each panel, so there's no high-voltage DC string at all. Each panel is independent. They cost more and there are more parts on the roof.
- Hybrid inverter. A string inverter with a battery connection built in. Worth choosing if you might add a battery later. See our guide to home batteries.
Using it, and getting paid for the rest
Every unit of solar you use yourself saves you buying one at your full price (the Ofgem cap average was 26.32p per kWh from 1 October to 31 December 2026). Exported units earn much less. Under the Smart Export Guarantee (SEG) in England, Scotland and Wales, suppliers pay for each unit you export, at a rate they set. Rates in 2026 ranged from about 1p to over 15p per kWh. To get SEG payments you need:
- an installation and installer certified under MCS (or a scheme accredited as equivalent), and
- a meter that records half-hourly exports, normally a smart meter.
Because using solar is worth more than exporting it, it pays to run the washing machine, dishwasher and car charging in the day, or to add a diverter that heats the hot water cylinder with spare solar, or a battery.
The rules
Telling the network operator
Anything that can export to the grid must be registered with your distribution network operator (DNO), under the Energy Networks Association's Engineering Recommendations:
- G98 covers small systems, up to 16 A per phase in total, which is 3.68 kW on a single-phase supply. The installer fits it and notifies the DNO within 28 days of commissioning.
- G99 covers anything bigger. The installer must apply to the DNO and get its agreement before connecting. The DNO may limit how much you can export, for example with an export limiter.
The 16 A limit is for the inverter rating, not the panels, so a 4.3 kWp array on a 3.68 kW inverter can still go under G98.
Wiring and Building Regulations
A PV system needs its own circuit from the consumer unit, which makes it notifiable electrical work under Part P in England and Wales: an installer registered with a competent person scheme self-certifies it, or Building Control is notified. BS 7671 Section 712 sets out the extra requirements for PV, including DC isolation, cable selection and warning labels. The roof must also be able to carry the extra weight and wind load.
Planning permission
In England, panels on a house roof are usually "permitted development", so they don't need planning permission, as long as they meet the conditions in the General Permitted Development Order (Schedule 2, Part 14, Class A). On a pitched roof they must not stick out more than 0.2 m from the roof slope, and must not be higher than the highest part of the roof, ignoring the chimney. They must be sited, as far as practicable, to minimise their effect on the look of the building and the area. You do need permission for a listed building, and there are extra limits in conservation areas and World Heritage Sites. Wales, Scotland and Northern Ireland have their own rules, so check with your council.
VAT
Solar panels installed in a home have a 0% VAT rate in the UK until 31 March 2027. From 1 April 2027 the rate goes back to 5%. This applies to an installer's supply and fitting, not to panels you buy to fit yourself.
Plug-in solar
Since 27 August 2026, plug-in solar kits have been legal to buy and use in Great Britain. These are small kits, up to 800 W, that plug into an ordinary socket, for a balcony, wall or garden. The government says one can provide up to about 20% of an average home's electricity. Only kits that meet the government's interim product specification can be sold and used, and they need a plug approved for this use under the amended Plugs and Sockets etc. (Safety) Regulations. Check whether you need permission from a landlord, freeholder or the council first. In England, permitted development doesn't cover plug-in solar on a wooden wall, balcony or enclosure, or on timber-clad parts of the outside of a house or flats.
Only use a kit that is clearly sold as meeting the UK specification. A generator on a plug carries risks that an ordinary appliance doesn't: if the plug is pulled while the panel is producing, a non-compliant kit could leave the pins live. Never plug one into an extension lead.
Looking after them
Panels have no moving parts and need little care. Rain does most of the cleaning on a pitched roof. Check your inverter's app or display now and then: a sudden drop in output on a sunny day usually means a fault or new shading. Inverters don't last as long as panels, so expect to replace one during the system's life.
Going deeper
Why output falls in hot weather
Crystalline silicon panels lose roughly 0.3 to 0.4% of their output for every degree the cells run above 25 °C; the exact figure is the "temperature coefficient of Pmax" on the datasheet. On a bright summer day cells can run 20 to 30 °C above the air temperature, so a panel can be 10% down on its rating at the time it gets the most light. That's one reason May and June often beat July.
Strings, MPPT and inverter sizing
An inverter's maximum power point tracker (MPPT) constantly adjusts the string's operating voltage to get the most power out of it. Panels on different roof faces should go on separate MPPT inputs, or use optimisers, because they peak at different times. It's common to fit more panel capacity than the inverter's AC rating (a DC to AC ratio of around 1.1 to 1.3), because the panels rarely reach their rating. The inverter "clips" the few peaks, losing a little energy at midday in exchange for more output in the mornings, evenings and winter. Check the string voltage at the coldest expected temperature, when it is highest, against the inverter's maximum input voltage.
Earthing and RCDs
Whether the AC side of a PV inverter needs a Type B RCD depends on the inverter. Many manufacturers state that their transformerless inverter can't feed smooth DC fault current into the AC side, so a Type A device is enough; without that statement, follow BS 7671 Section 712 and the manufacturer's instructions. Current can flow both ways through the PV circuit's protective devices, so check that any RCD or RCBO on it is rated by its manufacturer for that.
Testing
PV arrays are tested to BS EN 62446-1: string open-circuit voltage and short-circuit current against expected values, polarity, and insulation resistance of the DC side, alongside the usual BS 7671 tests on the AC side. The open-circuit voltage of each string should match the others on the same orientation closely; one low string usually means a panel or connector fault.
Sources
The main references behind this guide. Numbers we worked out ourselves, such as the code outputs, come from running the code.
- European Commission Joint Research Centre: PVGIS 5.3 photovoltaic performance and hourly series (SARAH3 radiation data)
- GOV.UK: Smart Export Guarantee (SEG), earn money for exporting the renewable electricity you have generated
- HMRC VAT Notice 708/6: energy-saving materials and heating equipment (zero rate to 31 March 2027, batteries from 1 February 2024)
- The Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2 Part 14 Class A (as amended 27 August 2026)
- DESNZ press release (26 August 2026): plug-in solar panels come to market
- DESNZ: Plug-in solar, regulatory amendment and interim product specification (consultation outcome)
- Energy Networks Association: G98 and G99 connection procedures (National Grid Electricity Distribution)
- Ofgem: energy price cap unit rates and standing charges, 1 October to 31 December 2026
- BS 7671:2018+A4:2026 Section 712 (solar photovoltaic power supply systems), Chapter 57 (stationary secondary batteries) and Chapter 82 (prosumer's installations) (IET, paid standard)