Inspection and testing cheat sheet

Printable one-page sheet of the test sequence, insulation resistance values, RCD trip times and ring final circuit checks for BS 7671 initial verification.

Full guide

Inspection and testing cheat sheet ohmandtoken.com

Order of tests (as listed in the FICA Section C guidance)

  1. Visual inspection
  2. Continuity (protective conductors, then ring final circuits)
  3. Insulation resistance
  4. Polarity
  5. Earth fault loop impedance (Ze and Zs)
  6. Prospective fault current (PSCC and PEFC: record the higher)
  7. Additional protection by RCDs and RCBOs
  8. Phase rotation
  9. Functional testing

Insulation resistance (BS 7671 Table 64)

CircuitTest voltage (DC)Minimum
SELV and PELV250 V0.5 MΩ
Up to 500 V (230 V and 400 V circuits)500 V1.0 MΩ
Above 500 V1000 V1.0 MΩ

RCDs

  • Test at IΔn: general RCDs trip within 300 ms; S type between 130 and 500 ms.
  • ½ × and 5 × IΔn tests aren't required since Amendment 2.
  • TT: RA × IΔn ≤ 50 V, so 1,667 Ω for 30 mA.

Continuity

  • Low-resistance ohmmeter to BS EN 61557-4: at least 200 mA. Null the leads.
  • Ring: r1 and rn within 0.05 Ω; r2 ≈ 1.67 × r1 for 2.5/1.5 mm²; each socket ≈ (r1 + r2) ÷ 4 after cross-connecting.
  • R1+R2 per metre at 20 °C: 1.0/1.0 mm² 36.20 mΩ; 1.5/1.0 mm² 30.20 mΩ; 2.5/1.5 mm² 19.51 mΩ; 4.0/1.5 mm² 16.71 mΩ; 6.0/2.5 mm² 10.49 mΩ.
  • Main bonding: in the order of 0.05 Ω or less.

Sources:

  • BS 7671:2018+A4:2026 Part 6 and Table 64 (IET, paid)
  • IET Guidance Note 3 (paid)
  • SJIB FICA candidate guidance, Section C

Always check against your own copy of the current documents. Mains work must be carried out by a competent person.