Motor control simulator

Run, wire, fault find and commission motor starters: direct-on-line, single phase, forward/reverse, star-delta, two speed, conveyor sequences, soft starters and inverter drives. Every wire, link, contact and winding is modelled, so whatever you connect or test gives the reading a real circuit would. About this simulator

About this simulator and how it works

Free demo: level 1 (4 jobs on a direct-on-line starter: start it, set it up off the nameplate, fix a missing hold-in wire and reverse a motor). Levels 2 to 6 (wiring single-phase, forward/reverse, star-delta, two-speed and sequence starters, 33 fault-finding breakdowns, soft starters, inverter drives and a full conveyor line with an emergency stop) are in the full version.

What you do

Each job puts you in front of a real starter: a panel with its isolator, fuses, contactors, overloads and terminal strip, a control station, a motor with its terminal box and the machine it drives, and the circuit drawing. You switch, press, wire, test and set things up the way you would on site, then hand the job over. The simulator then commissions your work for you: it runs the starter through its proper tests on a copy of your circuit and tells you exactly what passed and what did not.

The levels

  • Level 1, First starts (free): run a direct-on-line starter, read the nameplate, fit the star links, set the overload, fix a missing hold-in contact and reverse a motor.
  • Level 2, Wiring starters: wire a DOL control circuit, a single-phase pump starter, a forward/reverse starter with interlocks and a control transformer, and a whole DOL panel from an empty enclosure.
  • Level 3, Bigger motors: star-delta power wiring and set-up, a two-conveyor sequence and a two-speed (separate winding) fan.
  • Level 4, Fault finding: breakdowns on every kind of starter, picked at random from 22 kinds of real fault: blown fuses, failed overloads, open coils, burnt contacts, broken and loose conductors, open and shorted windings, earth faults, worn bearings, failed capacitors and centrifugal switches, stuck timers and interlocks.
  • Level 5, Drives and commissioning: wire and set up a soft starter with a line contactor, enter motor data into an inverter drive and wire one in.
  • Level 6, Full system: build a conveyor line with an emergency stop from Drawing 9, commission someone else's wiring and find two faults at once.

Every reading is real

Nothing is scripted. The circuit is solved electrically every few milliseconds: supplies, fuses, contacts, coils, lamps, transformers and every wire you add. Three-phase motors are modelled with their stator and double-cage rotor, so starting current, run-up time, slip, running current, single phasing, unbalance and a wrong star or delta connection all come out of the physics, not out of a table. The single-phase motor has its main and start windings, start capacitor and centrifugal switch. Overloads follow a class 10 curve, fuses a gG curve, the soft starter ramps its voltage and the drive makes its own frequency from its DC link. So if you wire something wrong the motor does what a real one would: hums, runs backwards, trips, or blows the fuses.

The instruments read the circuit, not the answer. A voltage indicator, a multimeter (V AC, V DC and ohms), an insulation and continuity tester, a clamp meter and a phase rotation tester all measure between the two points you touch, with whatever else is connected in parallel. Testing the coil of a contactor with a lamp still wired across it reads the lamp too, just as it would on site.

Safe working

The rules follow GS38 and the Electricity at Work Regulations 1989. Before you touch a terminal you must isolate, lock off and prove dead at the point of work: prove the voltage indicator, test every conductor to every other and to earth, then prove the indicator again. Opening a live terminal box, working on live terminals, testing insulation on a live circuit or reaching for a turning shaft is a safety strike; three strikes and you are off the job. Defeating the panel door interlock is allowed for live testing, but the door has to be shut and the interlock restored before you hand over.

Stars

One star for a job that passes its hand-over. Two stars with no safety strikes or slips. Three stars if you also used no hints, finished within the par time and did not change parts that were not faulty.

Standards and sources

Terminal markings follow EN 60445 and IEC 60034-8 (U1 V1 W1, W2 U2 V2; A1 A2; 13-14, 21-22, 95-96, 97-98). Control circuits follow EN 60204-1, including the control transformer for more than one starter, the bonded secondary, and an emergency stop that cannot restart the machine when it is released. Overload and contactor behaviour follows EN 60947-4-1. Motor data is typical of IE3 four-pole motors. The simulator is for learning: always follow the manufacturer's instructions and your site's rules on a real job.